NULL Pointer Dereference Affecting kernel-bootwrapper package, versions *


Severity

Recommended
0.0
medium
0
10

Based on Red Hat Enterprise Linux security rating

    Threat Intelligence

    EPSS
    0.04% (6th percentile)

Do your applications use this vulnerable package?

In a few clicks we can analyze your entire application and see what components are vulnerable in your application, and suggest you quick fixes.

Test your applications
  • Snyk ID SNYK-RHEL7-KERNELBOOTWRAPPER-7827484
  • published 23 Aug 2024
  • disclosed 22 Aug 2024

How to fix?

There is no fixed version for RHEL:7 kernel-bootwrapper.

NVD Description

Note: Versions mentioned in the description apply only to the upstream kernel-bootwrapper package and not the kernel-bootwrapper package as distributed by RHEL. See How to fix? for RHEL:7 relevant fixed versions and status.

In the Linux kernel, the following vulnerability has been resolved:

sched/fair: Fix fault in reweight_entity

Syzbot found a GPF in reweight_entity. This has been bisected to commit 4ef0c5c6b5ba ("kernel/sched: Fix sched_fork() access an invalid sched_task_group")

There is a race between sched_post_fork() and setpriority(PRIO_PGRP) within a thread group that causes a null-ptr-deref in reweight_entity() in CFS. The scenario is that the main process spawns number of new threads, which then call setpriority(PRIO_PGRP, 0, -20), wait, and exit. For each of the new threads the copy_process() gets invoked, which adds the new task_struct and calls sched_post_fork() for it.

In the above scenario there is a possibility that setpriority(PRIO_PGRP) and set_one_prio() will be called for a thread in the group that is just being created by copy_process(), and for which the sched_post_fork() has not been executed yet. This will trigger a null pointer dereference in reweight_entity(), as it will try to access the run queue pointer, which hasn't been set.

Before the mentioned change the cfs_rq pointer for the task has been set in sched_fork(), which is called much earlier in copy_process(), before the new task is added to the thread_group. Now it is done in the sched_post_fork(), which is called after that. To fix the issue the remove the update_load param from the update_load param() function and call reweight_task() only if the task flag doesn't have the TASK_NEW flag set.

CVSS Scores

version 3.1
Expand this section

NVD

4.7 medium
  • Attack Vector (AV)
    Local
  • Attack Complexity (AC)
    High
  • Privileges Required (PR)
    Low
  • User Interaction (UI)
    None
  • Scope (S)
    Unchanged
  • Confidentiality (C)
    None
  • Integrity (I)
    None
  • Availability (A)
    High
Expand this section

Red Hat

4.7 medium
Expand this section

SUSE

5.5 medium