Race Condition Affecting kernel-azure package, versions <5.14.21-150500.33.66.1


Severity

Recommended
0.0
medium
0
10

Based on SUSE Linux Enterprise Server security rating.

Threat Intelligence

EPSS
0.04% (6th percentile)

Do your applications use this vulnerable package?

In a few clicks we can analyze your entire application and see what components are vulnerable in your application, and suggest you quick fixes.

Test your applications
  • Snyk IDSNYK-SLES155-KERNELAZURE-7927936
  • published11 Sept 2024
  • disclosed10 Sept 2024

Introduced: 10 Sep 2024

CVE-2022-48921  (opens in a new tab)
CWE-362  (opens in a new tab)

How to fix?

Upgrade SLES:15.5 kernel-azure to version 5.14.21-150500.33.66.1 or higher.

NVD Description

Note: Versions mentioned in the description apply only to the upstream kernel-azure package and not the kernel-azure package as distributed by SLES. See How to fix? for SLES:15.5 relevant fixed versions and status.

In the Linux kernel, the following vulnerability has been resolved:

sched/fair: Fix fault in reweight_entity

Syzbot found a GPF in reweight_entity. This has been bisected to commit 4ef0c5c6b5ba ("kernel/sched: Fix sched_fork() access an invalid sched_task_group")

There is a race between sched_post_fork() and setpriority(PRIO_PGRP) within a thread group that causes a null-ptr-deref in reweight_entity() in CFS. The scenario is that the main process spawns number of new threads, which then call setpriority(PRIO_PGRP, 0, -20), wait, and exit. For each of the new threads the copy_process() gets invoked, which adds the new task_struct and calls sched_post_fork() for it.

In the above scenario there is a possibility that setpriority(PRIO_PGRP) and set_one_prio() will be called for a thread in the group that is just being created by copy_process(), and for which the sched_post_fork() has not been executed yet. This will trigger a null pointer dereference in reweight_entity(), as it will try to access the run queue pointer, which hasn't been set.

Before the mentioned change the cfs_rq pointer for the task has been set in sched_fork(), which is called much earlier in copy_process(), before the new task is added to the thread_group. Now it is done in the sched_post_fork(), which is called after that. To fix the issue the remove the update_load param from the update_load param() function and call reweight_task() only if the task flag doesn't have the TASK_NEW flag set.

CVSS Scores

version 3.1